2020 Road Resurfacing
GREEN, Ohio – The City of Green is resurfacing 14.64 lane miles of roadway beginning late Spring 2020. In addition, the City is extending the life of 9.74 lane miles with micro resurfacing, a process that seals existing pavement surfaces, increases skid resistance, and fixes minor rutting issues. The total cost of resurfacing is $2.2 million. *
The following roads to be resurfaced in 2020:
Camelot Circle from E. Caston to cul-de-sac (0.10 lane miles)
Thursby Road from Koons to cul-de-sac (1.42 lane miles)
Comet Road from S. Main to Christman (2.3 lane miles)
Fortuna Drive from E. Turkeyfoot Lake (SR 619) to cul-de-sac (0.96 lane miles)
Interstate Parkway from S. Arlington to cul-de-sac (0.98 lane miles)
Subdivisions:
Acadian Heights (1.38 lane miles)
Rolling Greens (3.94 lane miles)
Greensburg Heights (3.56 lane miles)
The following roads to be micro surfaced in 2020:
S. Arlington Road from Greensburg to South Corporate Limit (5.5 lane miles)
Heckman Road from Mayfair to East Corporate Limit (2.04 lane miles)
Shriver Road from Steese to Greensburg (2.2 lane miles)
For more information on construction, visit cityofgreen.org.
*Pending City Council approval March 11 Resolution number 2020-R23

The City of Green, Ohio, founded in 1992, is a prosperous, progressive and promising city with more than 25,000 residents. Approximately 33.5 square-miles, Green is located in southern Summit County. Visit www.cityofgreen.org.
###