Paul Pickett, City Engineer

Engineering Department

Paul Pickett, P.E., City Engineer
South Annex Administration Building
5383 Massillon Road
P.O. Box 278 Green, OH 44232-0278

Telephone:  330-896-5510
Fax:  330-896-6606
Email Engineering

Engineering Department Staff
John Walch, Engineering Technician
Dave Schemansky P.E., Project Manager
Deb Talkington, Administrative Secretary

Engineering Department Functions
The City Engineer, along with engineering consulting firm Floyd Browne Group, works to design and oversee public improvement projects. This also i
ncludes project overview, contract awards, bid information, notice for sealed bids, and bid tabulations.

Road Closures (All Closing Schedules are Weather Dependent)

WISE ROAD CLOSURE

Wise Road is closed at address 2515 for an emergency sanitary sewer manhole replacement. It should open sometime on Friday, July 25. A detour route is posted using Massillon Road, Greensburg and Mayfair. Access to 2515 and below is possible from Massillon Road and addresses above 2515 can be accessed from Mayfair Road.

 

STEESE/SHRIVER ROAD PROJECT UPDATE

Steese Road will be closed June 16 to until August 25 to reconstruct the Intersection of Steese and Shriver Roads. See Posted Detour Route.

Green, OH –The intersection of Steese and Shriver Roads will be closed June 16 until August 25 to allow for reconstruction. The project will be constructed by the awarded contractor, Wenger Excavating of Dalton, Ohio.

During construction, the entrance to Green Intermediate School will be realigned with Shriver to allow for better traffic flow and increased safety. Also, the road will be lowered to improve the sight distance, and a third left turn lane, sidewalks and curbs will be added. This segment of the project is approximately 1,000 feet. Access to Queen of Heaven Church will be maintained from Massillon Road/ Route 241.

Once funding is approved, the city plans to extend the road widening and addition of sidewalks and curbs from Massillon Road to Greenwood Drive.

“This project does require the road to be closed to make the necessary reconstruction changes,” said Paul Pickett, city engineer. “We will do our best to reduce the inconvenience to the residents of Steese and nearby neighborhoods as much as possible.”

The posted detour for this project from Massillon Road/Rt. 241 is Boettler to Arlington Road.

“Rest-assured that access for city safety personnel will be maintained at all times,” said Mayor Dick Norton, referring to Fire Station One located at the corner of Steese and Massillon Roads. “Fire department personnel will assess the project on a daily basis to ensure they have a proper access route on Steese in the event of a life-threatening emergency.”

For the most current information please contact the City Engineer's office by phone (330) 896-5510 or email: engineer@cityofgreen.org.


Notice for Sealed Bids - Upcoming Projects


Bid Tabulations

Christman Bike Lane Bid Results

Ariss Park Bid Results

Springview Estates Bid Results

Steese/Shriver Intersection Bid Results

Massillon Road Reconstruction South


Links
www.co.summit.oh.us Summit County Department of Environmental Services Contacts
www.engineer.co.summit.oh.us Summit County Engineer’s Office
www.floydbrowne.com Floyd Browne Group (formerly EDG)
www.dot.state.oh.us Ohio Department of Transportation (ODOT)

Back to top